Raised-fabric lead-time promise: 1 week for greige, 2 weeks for dyed
MillA lead time is only useful if you can plan a sailing date around it. So we publish ours as a commitment rather than an estimate: about one week for raised greige, about two weeks for dyed raised fabric, counted from sample approval and receipt of the deposit.
Why raised fabric can be that fast
Bleached raised fabric runs on our looms all year, not as a special order. Greige rolls are already in the warehouse and the raising line is set up for the constructions we sell most, so a colour that matches a shade we run regularly does not have to wait for a loom slot. Reactive dyeing in the drum follows on the same site — weaving, raising, dyeing and sewing are under one roof, with no truck between them and no subcontractor's queue.
What makes a date move
Three things, in our experience. First, colour chemistry: a shade that has to be matched from a Pantone chip rather than a lab dip needs a round of approval, and every round costs days. Second, quantity against drum capacity — a very small dye lot is inefficient and a very large one may need two passes. Third, the calendar: the six weeks before Chinese New Year are not a good time to discover that you need 20,000 m in a hurry. We say so at quotation instead of after the deposit.
How to read the two weeks
Day 1 to 3, dyeing and drying. Days 4 to 8, raising, setting and inspection. Days 9 to 12, packing, documentation and handover to the forwarder. Export documents and booking are on us; the sailing schedule is not, and we will tell you honestly when a vessel is tight.
What we need from you
Width (90–230 cm standard), weight per square metre, colour reference, quantity and destination port. With that we can confirm a date and hold it in the contract.